How electricity is helping India gain: Ease of Doing Business Ranking
EASE OF DOING BUSINESS – GETTING ELECTRICITY – In India:
World Bank "Ease of doing business" initiative ranks countries on the basis of ten parameters. 'Getting Electricity' is the one of these parameters.
For 'Getting Electricity', World Bank measures the
performance on 4 parameters:
(i)
Number of procedures
(ii)
time for obtaining a commercial electricity
connection
(iii)
Cost for obtaining a commercial electricity
connection up to 140 KVA
(iv)
Reliability of power supply.
India has made several
reform initiatives because of which. India’s ranking has improved from 137 in
THE REPORT 2015 to 24 in THE REPORT 2019.
|
|
Report 2015 |
Report 2019 |
Report 2020 |
||
|
Overall rank |
142 |
77 |
63 |
||
|
Getting Electricity rank |
137 |
24 |
22 |
||
|
|
Mumbai |
Delhi |
Mumbai |
Delhi |
Mumbai & Delhi |
|
Procedures (no) |
7 |
7 |
4 |
3 |
3 |
|
Time (Days) |
67 |
140 |
82 |
31 |
52.9 |
|
Cost (% of per capita
income) |
84 |
846 |
10.4 |
46.4 |
28.6 |
|
Reliability of supply
and transparency of tariff index |
- |
- |
7 |
6 |
6 |
These initiatives
include regulatory easing as well as reforms measures:
REGULATORY REFORMS MADE
BY CENTRAL ELECTRICITY AUTHORITY AND REGULATORS
·
CEA regulations amended for allowing
installation of transformers up-to 500 KVA on double pole structure.
·
CEA notification to waive off electrical
inspector approval for 11 KV installations carried out by DISCOMs and allowing
self certification by DISCOMS engineers in such cases.
·
Changed Tariff Regulation in Delhi to
allow LT connection up-to 150 KVA and rationalized LT Tariff for taking LT
connection up-to 150 KVA.
·
Change in Supply code in Delhi to
facilitate reduction in cost and time for new connection.
REFORMS REPORTED BY DEIHI AND MUMBAI IN THE CURRENT
YEAR
·
In Mumbai and Delhi, applications are to
be applied mandatory online and only two documents are required for obtaining
electricity connection.
·
Mumbai has reduced the no of procedures
from 4 to 3. MERC has issued new practice direction under Electricity Supply
Code Regulation, 2005 on 25th March 2019. Now submission/ uploading of
electrical installation's test report is not required. lt is now a part of
self-declaration at the time of submitting the online application. Delhi has
already adopted this practice in previous years.
· DERC vide its 2nd amendment regulations
has amended existing provisions of Supply Code and Performance Standards
Regulations, 2017 for acceptance of bank guarantee from the interested
applicants having contract demand of 100 kw & above. This is being followed
in Mumbai since last years.
·
Dig and restore has been made operation
in Delhi. Also online ROW, permission is operational in Delhi. ln Mumbai also
online ROW permission is operational and commitment is there to provide such
permission within 2 days.
· ln Delhi, SCADA has been upgraded to
ADMS (Advanced Distribution Management System) which facilitate quick response
and restoration to supply interruptions.
RESOURCES FOR OBTAINING
INFORMATION ON ADANI ELECTRICITY, MUMBAI AND TATA POWER, DELHI
·
For Adani Electricity, Mumbai
https://www.adanielectricity.com/EaseofDoingBusiness
https://iss.adanielectricity.com/mumbainsc/
·
For Tata Power, Delhi
https://www.tatapower-ddl.com/customers/apply-for-new-connection/ease-of-doing-business